When a Storage Project has been approved it is important to make sure
all files belonging to the project are moved from each members personal
directory under /pfs/nobackup/home/ to the new project storage directory.
30 days after the approval of the project storage the quota settings for each
user in the /pfs/nobackup/home file system will be reduced to 25GB,
just enough to keep certain user specific configuration files.
Project storage is by default only accessible by the members of the project.
Active project storage without backup for local HPC2N projects.
Apply for a file quota of 1 million files unless you have a good motivation for more.
Apply for a file quota of 1 million files unless you have a good motivation for more.
Project storage for NAISS as well as LiU Local projects with compute allocations on resources hosted by NSC.
Centre Storage @ NSC is designed for fast access from compute resources at NSC. It consists of one IBM ESS GL6S building block and one IBM ESS 5000 SC4 building block.
In total there are 946 spinning hard disks and a small number of NVRAM devices and SSDs which act as a cache to speed up small writes. The total disk space that is usable for storing files is approximately 6.9 PiB.
Project storage for NAISS as well as PDC projects with compute allocations on resources hosted by PDC.
Klemming is designed for fast access from compute resources at PCD. It uses the Lustre parallel file system, which is optimized for handling data from many clients at the same time. The total size of Klemming is 12 PB.
Minimum size: 10 TB. Storage attached to Rackham and Snowy at UPPMAX.
Storage attached to Rackham and Snowy at UPPMAX. Apply for at least 10 TB here. PI:s with needs smaller than 10 TB must apply for a SMALL Storage project.
Active data storage for Rackham projects. Primarily for life science projects.
Click above to show more information about the resource.