This round has been closed as all proposals have been handled.
See further information.
| Resource | Centre | Total Requested |
Upper Limit |
Default Storage |
Available | Unit | Note | |
| Beda | C3SE | 1 199 | 185 | 1 200 | x 1000 core-h/month | No guarantees on availability given | ||
|
Beda will be run at best-effort until a replacement system needs the computer room capacity. Beda is now without service contract, therefore reductions (or total loss) of capacity is to be expected.
Best-effort also implies that software installations and support on Beda will be given a low priority.
The capacity cluster cluster consists of 268 compute servers (nodes) and five system servers. Each of the compute nodes are equipped with two Quad-core Intel® Xeon 5520 (Nehalem 2.26 Ghz, 8 MB cache) processors. 24 of the nodes have 48 GB memory and one has 72 GB memory, while the remaining nodes have 24 GB each. The interconnect is Infiniband with 20 Gb/s. The system is connected to a gigabit Ethernet. |
||||||||
| Glenn | C3SE | 3 320 | 330 | 1 735 | x 1000 core-h/month | |||
The Glenn cluster is built on AMD Opteron 6220 (code-named "Interlagos") CPU's. The system consists of:
In total 379 compute nodes (total of 6080 cores) and 18.1 TB of RAM. More specific:
|
||||||||